Neath Port Talbot planning applications
SiteLens tracks and classifies every planning application submitted to Neath Port Talbot County Borough Council, updated daily. Neath Port Talbot County Borough Council received 130 planning applications in the last 90 days, 9 of them major schemes. 97% of the applications it decided were approved, with a median decision time of 63 days.
Search Neath Port Talbot planning applications
Filter by type, value, date and status. The council's own register is on the official Neath Port Talbot County Borough Council planning portal.
Recent applications in Neath Port Talbot
See all →Majors and higher-value work first, tree works, condition discharges and adverts last.
Former Tirbach Washery Ystalyfera Swansea
160-dwelling residential scheme on a former industrial site, outline permission sought. Redevelops a derelict washery with up to 160 homes and infrastructure at outline stage, access only reserved. Groundworks, drainage and site remediation dominate first phase, with frame and envelope packages…
GroundworksDrainageStructural frame
South East Of Llandewi Brefi Ceredigion SY25 6PE
55-turbine wind farm up to 220m, Ceredigion. Major renewable energy scheme with full EIA scoping consultation underway. Civil works, foundations, electrical infrastructure and grid connection drive procurement across multiple specialist trades.
GroundworksStructural frameSteel
Land Off Pen-Y-Bryn & Menai Avenue Croeserw Cymmer Neath Port Talbot SA13 3SD
25-unit mixed-tenure housing scheme, Port Talbot, two sites. Delivers flats, bungalows and semi-detached homes with accessible and wheelchair-user units at full application stage. Groundworks and frame packages lead, followed by brickwork, roofing and M&E at volume across multiple building types.
GroundworksStructural frameBrickwork
8,10 And 12 Queen Street Neath Neath Port Talbot SA11 1DL
18-unit mixed-use scheme with retail, full planning approval. Four-storey building delivering 18 flats above ground-floor retail, parking and storage. Groundworks, structural frame, M&E, fit-out and drainage work available.
DemolitionGroundworksStructural frame
Marlas Pumping Station Within Bridgend County Borough To A Location Within TATA Steelworks Adjacent To Heol Heol Cae'r Bont
5.75km wastewater rising main replacement, screening opinion stage. Linear pipeline infrastructure from Marlas Pumping Station to TATA Steelworks requiring EIA screening determination. Groundworks, trench excavation and pipeline installation across urban and industrial terrain.
GroundworksDrainageDemolition
Land At Heol Tabor Cwmavon Neath Port Talbot SA12 9PS
10-unit residential scheme with full site infrastructure, Cwmavon. Up to ten new homes with engineering works, access roads, drainage and landscaping at full application stage. Groundworks, drainage and site infrastructure open first; brickwork and roofing follow.
GroundworksDrainageStructural frame
30-32 Morrisons Daily Station Road Port Talbot Neath Port Talbot SA13 1JS
Four-flat conversion from two larger units, Port Talbot. Subdivides an existing two-flat building into four two-bedroom homes at full application stage. Partitioning, rewiring, plumbing and bathroom/kitchen multiplication drive the fit-out spend.
Fit-outM&EDrainage
Land Between Mardon Park And Baglan National Grid Compound Baglan Energy Park Neath Port Talbot
Water pipe connection to electricity substation, Baglan Energy Park. Installs utility infrastructure linking a water supply to an existing National Grid facility at full application stage. Groundworks, trenching and specialist pipe installation suit civils contractors and utilities specialists.
GroundworksDrainage
Unit 1 Ynysygerwn Avenue Aberdulais SA10 8HH
Retention of exhaust and roof flues for an upgraded spray booth, Aberdulais. Formalizes ventilation infrastructure serving an internal industrial spray booth at full application stage. Extraction ducting, flue terminations and M&E connections drive the specification for mechanical engineers and…
M&EFit-out
Graig Madoc Lane From Marlas Road To Llanmihangel Farm Pyle Neath Port Talbot CF33 6RL
Detached house raising, extension and garage replacement, Pyle. Raises eaves and ridge by 1m, adds front porch and two rear extensions, replaces garage with car port and plant room at full application stage. Structural steelwork, roofing, brickwork and drainage packages define the scope, with…
Structural repairRoofingBrickwork
Bryncoch Sports Club Ty Llwyd Bryncoch SA10 7DQ
Steel viewing platform and external staircase for a sports club, Bryncoch. Adds structural steelwork to east and west elevations with fenestration alterations at full application stage. Steel fabrication, staircase installation and glazing replacement drive the commercial opportunity.
SteelStructural frameGlazing
36 Orchard Street Neath Neath Port Talbot SA11 1HA
Dental laboratory conversion on Neath High Street. Repurposes office space across two floors for laboratory, consulting rooms and reception at full application stage. Specialist ventilation, dental-grade flooring and M&E reconfiguration suit fit-out contractors.
Fit-outM&EDrainage
Aberpergwm Colliery B4242 From Rheola To Glynneath Glynneath Neath Port Talbot SA11 5AJ
Diesel tank installation at industrial site, full application. New tank fit-out requiring M&E and groundworks connection. Specialist mechanical and civil works opportunity.
GroundworksM&E
188 Water Street Aberavon Neath Port Talbot SA12 6LL
Ground-floor retail unit conversion to food and drink premises. A1-to-A3 change of use with shopfront alterations and extraction flue installation. M&E, glazing, and façade works opportunity in town-centre location.
GlazingM&EFaçade repair
Natural Resources Wales : Pelenna Forest - Q9601 9601Q 1.6Km East Of Clyne, Nrw Forest Block - Pelenna What3words : ///Removable.Declares.Scrub Resolven, Neath SA11 4EW
Aggregate extraction notification for forest road maintenance, Pelenna Forest. Prior notification for extraction of stone to construct and maintain forest roads and hard standings on a Natural Resources Wales site. Quarry plant operation and bulk haulage drive the activity; material suppliers…
Planning appeals in Neath Port Talbot County Borough Council
Neath Port Talbot County Borough Council is not in England, so the Planning Inspectorate does not decide its planning appeals. They are decided by Planning and Environment Decisions Wales (PEDW). SiteLens holds that body’s own record, read against that nation’s rate instead.
SiteLens is still collecting PEDW's record, so a rate now would reflect which parts have been collected, not how Neath Port Talbot County Borough Council fares.
Source: PEDW's own published case record. Still being collected, so the counts are a floor.
Neath Port Talbot County Borough Council approval rates by application type
Share of decided applications approved in the last 12 months.
- householder98% (92 decided)
- commercial94% (35 decided)
- other100% (34 decided)
- residential92% (12 decided)
Nearby councils
Comparing planning tools?
What you get with SiteLens
Map and project brief
Every application mapped, with its category, trade, estimated value band and a plain-English brief.
Constraints and tenders
24 constraint flags on every site, and the public tenders and awards near it.
Daily alerts
New matching applications from this council, by email each morning.
Who's behind it (Pro)
The agent and applicant, their contact details where published, and the company directors.
Start tracking Neath Port Talbot today
The Free plan is free forever, no card needed. Pro is £39/mo, or £29/mo billed annually.
Start for free