Built for material suppliers

Material suppliers: reach the specifier before the product is chosen.

On major schemes SiteLens reads the planning documents for the architect, engineers and main contractor, and flags builds about to start.

No credit card, no call · Free forever tier · 380+ UK councils · Updated daily

901 new major applications in the last 30 days

97 of them in the last 7 days. Figures to 3 Nov 2026, dated by when the council validated or received each application, or when SiteLens first found it.

See these applications →

Busiest councils for major schemes

  1. Buckinghamshire23
  2. Cornwall19
  3. Shropshire16
  4. Dumfries and Galloway15
  5. Enfield12

By estimated value

  • <£10k11
  • £10k-50k56
  • £50k-100k35
  • £100k-500k72
  • £500k-1m70
  • £1m-5m202
  • £5m-20m205
  • £20m+122

Recent examples

Fenland · 27 Oct 2026Pending

Land South Of Barkers Lane And East Of Wimblington Road March Cambridgeshire

333-dwelling residential scheme, reserved matters, March. Detailed layout, appearance, landscaping and scale approval for 333 homes pursuant to outline permission on land off Barkers Lane, March…

ResidentialMajor£20m+Est.GroundworksDrainageStructural frame

Redbridge · 27 Oct 2026Pending

Development At Land At Winston Way, Land On The North Side Of And At 300 To 310, High Road, Ilford

72-unit mixed-use tower scheme, Ilford, full application. Demolition and redevelopment into a part-6, part-14-storey block with ground-floor commercial space and public realm works. Demolition…

Mixed useMajor£20m+Est.DemolitionGroundworksStructural frame

Uttlesford · 27 Oct 2026

Land To The South Of Wicken Road Newport Essex

300-dwelling outline residential scheme, Newport, access only. Up to 300 homes on 25.39 hectares with a new London Road access and Class E hub, at outline stage. Groundworks, drainage and hard…

ResidentialMajor£20m+Est.GroundworksDrainageStructural frame

Highland · 26 Oct 2026Pending

Sub-Phase 2B Land North East Of Tornagrain Dalcross

143-home Tornagrain sub-phase 2B scheme, matters specified approval. Details for 143 homes and six shop units on 3.95 hectares, approved under the Tornagrain planning permission in principle…

ResidentialMajor£20m+Est.GroundworksDrainageStructural frame

Bedford · 26 Oct 2026Pending

Parcel 3.2 Village 3 Bedford Road Wixams Bedfordshire

133-home Wixams housing scheme, reserved matters stage. Reserved matters for layout, scale, appearance and landscaping on parcel 3.2, varying the outline permission to lift Block B's use restriction…

ResidentialMajor£20m+Est.GroundworksStructural frameBrickwork

Edinburgh · 23 Oct 2026

Site 60 Metres South Of 199 Fountainbridge Edinburgh

27,516 sqm mixed-use hotel and student scheme, Edinburgh, full permission stage. Fountainbridge site combining hotel, student rooms, co-working, gym, restaurant and rooftop bar on 0.37 hectares…

Mixed useMajor£20m+Est.GroundworksStructural frameBrickwork

How material suppliers use SiteLens

Reach the specifier early

Most suppliers arrive at tender, after the spec is set. On major schemes, Pro names the architect and engineers who write it.

Call when the build starts

Free alerts fire when a scheme is about to start on site or building control records a start.

Retrofit signals from EPC

Free EPC and retrofit-gap filters, plus EPC alerts, match homes on their own certificate and point you to insulation, glazing and heating work.

A SiteLens record for a major school rebuild in Trafford: an estimated value of £5m to £20m, the agent, applicant and main contractor, the trades the scheme needs, a planning timeline and a plain-English project brief.
Pro viewTrades needed, estimated value and planning stage.
Figures SiteLens read from the planning documents of a major scheme (floorspace, site area, storeys and parking) and the project team they name: architect, structural engineer, M&E consultant and main contractor, with Companies House details. Directors are blurred.
Pro viewThe free plan shows which roles are named and each firm’s Companies House number.

Free to start. Pro is £39/mo, or £29/mo billed annually.

Free covers search, application views and one daily alert, with each firm shown by its Companies House number. Pro adds the firm names, the project team on major schemes, published contact details and competitor watch. Team shares one pipeline across up to 5 users.

Frequently asked

How early can a supplier see a project?

At validation, often months before a main contractor places orders. On major schemes Pro names the project team from the planning documents, so you reach the architect while the spec is open.

What does the free plan give a supplier?

Unlimited search and application views, one daily alert, start-on-site signals, EPC ratings, constraint flags, verified figures and nearby public tenders. Pro adds the project team’s firm names, contact details, 5 alerts and CSV export.

Can I find applications that mention my product?

Yes. Keyword search matches the application description, so terms such as Crittall, sash or green roof find the schemes that name them. Save the search as a daily alert.

See the projects before your competition quotes.