East Midlands

South Kesteven planning applications

SiteLens tracks and classifies every planning application submitted to South Kesteven District Council, updated daily. South Kesteven District Council received 194 planning applications in the last 90 days, 8 of them major schemes. 94% of the applications it decided were approved, with a median decision time of 41 days.

194Applications (90 days)
8Major applications
94%Approval rate
41 daysMedian decision time
TodayLast updated

Search South Kesteven planning applications

Filter by type, value, date and status. The council's own register is on the official South Kesteven District Council planning portal.

Recent applications in South Kesteven

See all →

Majors and higher-value work first, tree works, condition discharges and adverts last.

S26/1664ResidentialMajor£20m+est.

Land South Of Towngate East And West Of Linchfield Road Market Deeping Lincolnshire

Up to 800-unit mixed-tenure residential scheme, Market Deeping. Major new settlement with dwellings, retirement and care housing, access roads, parking and landscaping at scoping opinion stage. Groundworks, drainage and infrastructure packages will drive early procurement; frame and envelope trades…

GroundworksDrainageStructural frame

S26/1400Residential£5m-20mest.

Land West Of Main Road Long Bennington Lincolnshire

50-unit residential scheme, affordable housing details submission. Section 106 compliance documentation for consented dwelling scheme at reserved-matters stage. M&E, drainage and structural frame trades follow condition discharge and formal consent progression.

GroundworksStructural frameBrickwork

Approved
S26/1497Residential£1m-5mest.

Development Opposite Daybrrook Close The Drift Harlaxton Lincolnshire NG32 1AE

Variation of condition on a nine-dwelling scheme, Harlaxton. Amends the approved plans for three-bed houses without changing the substance of the permission. The parent scheme remains live; revised drawings enable procurement of frame and envelope packages to proceed.

Pending
S26/1560Residential£500k-1mest.

2nd Stamford (Town) Scout Group Land Off Drift Avenue Stamford PE9 1YJ

Six-unit mixed housing scheme replacing a scout hut, Stamford. Demolishes an existing building and erects four flats in two two-storey blocks and two two-bedroom bungalows, with new access and parking at full application stage. Demolition and groundworks precede structural frame and brickwork on…

DemolitionGroundworksStructural frame

Pending
S26/1467Residential£500k-1mest.

The Sticks 59 Haconby Lane Morton Lincolnshire PE10 0NP

Two detached dwellings, Morton, Lincolnshire. New-build scheme for two houses at full application stage. Groundworks, frame and roofing packages open early; brickwork and M&E follow at typical residential pace.

GroundworksStructural frameBrickwork

S26/1238Mixed use£100k-500kest.

21 And 23 Godsey Crescent Market Deeping Lincolnshire PE6 8HU

Mixed-use conversion to residential and childcare, Market Deeping. Reconfigures an existing building for one dwelling plus a childcare facility at full application stage. Fit-out, safety partitioning, kitchen and bathroom upgrades drive the cost, with outdoor play-space works completing the package.

Fit-outM&EDrainage

Pending
S26/1525Commercial£100k-500kest.

74 Station Road Deeping St James Lincolnshire PE6 8RQ

704 sqm trade counter replacement, Deeping St James. Erects a new commercial building to replace an existing unit at full application stage. Structural frame, cladding and M&E packages suit industrial builders and material suppliers in the East Midlands market.

GroundworksStructural frameCladding

Pending
S26/1498Householder£50k-100kest.

120 Stephenson Way Bourne Lincolnshire PE10 9DD

Single-storey extension above existing garage, Bourne. Adds first-floor accommodation over the garage structure at full application stage. Structural steels, roofing and glazing packages are the primary trades, with drainage and M&E following through the build.

SteelRoofingGlazing

Pending
S26/1437Householder£50k-100kest.

1 Lumbys Terrace Stamford Lincolnshire PE9 2NS

Listed building alterations to a Stamford terrace, internal reconfiguration and remedial works. Ground-floor wall removal and doorway relocation, plus first-floor bathroom and WC rework at consent stage. Structural support, M&E rewiring and specialist joinery for heritage compliance are essential…

Structural repairM&EJoinery

S26/1631Infrastructure<£10kest.

Wyndham Park Hill Avenue Grantham Lincolnshire NG31 9BB

CCTV pole and camera installation, Grantham park. Six-metre pole with three cameras mounted at Wyndham Park, full application stage. Ground anchoring and electrical connection are the primary trades; minimal material volume but site-specific installation work.

GroundworksM&E

Pending
S26/1545Residential

Windy House Neslam Road Sempringham Lincolnshire NG34 0NH

Occupancy condition removal on a consented dwelling, Sempringham. Section 73 application to lift the agricultural occupancy restriction from a 2003 replacement-dwelling permission. Signals the property can now be sold or let without agricultural-worker tying, unlocking the asset value of the…

S26/1665Householder£10k-50kest.

27 Low Road Manthorpe Lincolnshire NG31 8NQ

Conservatory replacement with a garden room, Manthorpe. Removes an existing conservatory and erects a replacement garden room structure at full application stage. Glazing, brickwork and groundworks packages suit local subcontractors and material suppliers.

GroundworksBrickworkRoofing

Pending
S26/1361Householder£10k-50kest.

2 Dovedale Close Grantham Lincolnshire NG31 8EA

Garden summer house converting to dog grooming salon, Grantham. Repurposes an existing outbuilding for commercial pet-grooming use at full application stage. M&E and plumbing upgrades for wash bays and drainage, plus fit-out and ventilation for grooming equipment.

Fit-outM&EDrainage

S26/1106Householder<£10kest.

10 Maiden Lane Stamford Lincolnshire PE9 2AZ

Like-for-like window replacement on a Stamford house. Two wood windows replaced on the gable elevation at full application stage. Glazing and joinery supply opportunities only; no structural works or major trades follow.

GlazingJoinery

S26/1107Householder<£10kest.

10 Maiden Lane Stamford Lincolnshire PE9 2AZ

Like-for-like window replacement on a listed house, Stamford. Replaces two wood windows on the gable side under listed building consent. Heritage glazing and joinery are the focus; materials and detailing must match the existing fabric.

GlazingJoinery

Planning appeals in South Kesteven District Council

An allowed appeal is one the council lost. Some kinds of appeal succeed far more often than others, so South Kesteven District Council is compared with the national rate for its own mix.

South Kesteven District Council, raw rate

32%

of judged appeals were allowed

Expected for this mix of appeals

29.5%

national rates applied to this caseload

2.5 percentage points above expected. South Kesteven District Council's decisions are overturned more often than the national record predicts.

363 appeals counted, 353 judged either way (113 allowed, 240 dismissed), 10 judged neither way. These are appeals decided 2016-07 to 2026-06.

By kind of appeal

South Kesteven District Council appeal outcomes by appeal type, with the national rate for each type
Appeal typeThis councilNationalCasesJudgedAllowed
Planning Appeal31.5%28.8%25825480
Householder (HAS)44.4%35.6%545424
Listed Building Consent & Conservation Area Consent Appeal17.4%25%23234
Lawful Development Certificate33.3%36.9%1093
Enforcement Notice0%13.5%960
3 more appeal types with fewer than 5 judged
South Kesteven District Council appeal types with fewer than 5 judged, so no rate
Appeal typeThis councilNationalCasesJudgedAllowed
Commercial Appeal Service (CAS)Too few judged33.3%542
High HedgesToo few judged28.5%210
Tree Preservation OrderToo few judged20.6%220
How we calculate this

Judged means allowed or dismissed. Withdrawn, invalid, split and unrecorded appeals are counted but never treated as appeals the council won. Expected applies the national rate for each appeal type to this council's own caseload. National rates by type are in The State of UK Planning.

Source: the Planning Inspectorate's Casework Database on GOV.UK, not the council's own planning register. Contains public sector information licensed under the Open Government Licence v3.0.

Money behind development in South Kesteven District Council

Developer contributions at South Kesteven District Council

Developers pay into planning obligations at South Kesteven District Council, each sum tied to a purpose in the agreement.

£29,582,986
Collected
£7,333,754
Available, per the register

Available is the register's own figure: money banked against a purpose in a signed agreement and not yet paid out. Councils differ on whether it excludes earmarked sums.

South Kesteven District Council developer contributions by purpose
PurposeCollectedAvailable
Education£17,311,579£3,206,780
Health and social care£2,045,168£1,389,462
Affordable housing£5,138,883£1,158,330
Open space and play£1,907,431£587,795
Highways and transport£1,985,232£558,660
Community facilities£537,491£309,647
Biodiversity and ecology£70,287£70,121
Employment and skills£22,912£22,912
Community safety£238,990£18,575
Monitoring and administration£154,613£11,472
Libraries and culture£100,000None
Sport and leisure£69,126None
Waste and recycling£1,274None

Source: South Kesteven District Council's Section 106 register, read on 29 September 2026. Figures are the whole of each register as published on that date, not a recent period. Our collected totals match each register’s own published total exactly. Purposes are grouped from the council's own wording.

Affordable housing grant in South Kesteven District Council

What central government confirmed: schemes in the area with Homes England grant agreed.

14
Confirmed schemes
221
Homes
£12,796,981
Grant requested
  • Social rent4 homes
  • Affordable rent135 homes
  • Shared ownership82 homes

Source: Homes England Affordable Homes Programme 2021 to 2026, GOV.UK transparency data, as at 31 March 2025. Contains public sector information licensed under the Open Government Licence v3.0. Grant requested is the figure when grant was confirmed, not money drawn down. Schemes are placed by local authority name.

South Kesteven District Council approval rates by application type

Share of decided applications approved in the last 12 months.

  • other98% (165 decided)
  • householder92% (112 decided)
  • residential87% (30 decided)
  • infrastructure100% (18 decided)

What you get with SiteLens

Map and project brief

Every application mapped, with its category, trade, estimated value band and a plain-English brief.

Constraints and tenders

24 constraint flags on every site, and the public tenders and awards near it.

Daily alerts

New matching applications from this council, by email each morning.

Who's behind it (Pro)

The agent and applicant, their contact details where published, and the company directors.

Start tracking South Kesteven today

The Free plan is free forever, no card needed. Pro is £39/mo, or £29/mo billed annually.

Start for free