Central Scotland

Glasgow planning applications

SiteLens tracks and classifies every planning application submitted to Glasgow City Council, updated daily. Glasgow City Council received 397 planning applications in the last 90 days, 13 of them major schemes. 89% of the applications it decided were approved, with a median decision time of 78 days.

397Applications (90 days)
13Major applications
89%Approval rate
78 daysMedian decision time
TodayLast updated

Search Glasgow planning applications

Filter by type, value, date and status. The council's own register is on the official Glasgow City Council planning portal.

Recent applications in Glasgow

See all →

Majors and higher-value work first, tree works, condition discharges and adverts last.

26/01968/FULIndustrialMajor£5m-20mest.

Site At Swanston Street/Strathclyde Street/ Cotton Street Glasgow

3,483 sqm industrial unit with demolition and parking, Glasgow. Replaces existing structures with a new Class 5 factory/warehouse and associated parking at full application stage. Portal frame, cladding, industrial flooring and yard drainage drive the procurement, with M&E and groundworks packages…

DemolitionGroundworksStructural frame

Pending
26/00371/FULResidentialMajor£5m-20mest.

Site To The North Of Royston Road/ Cumbernauld Road Glasgow

13-dwelling residential scheme with road and nature park, Glasgow. Variation adding three dwellings and substituting house types across ten plots, with road formation and landscape conservation at full application stage. Groundworks, drainage and frame packages dominate, with brickwork and roofing…

GroundworksDrainageStructural frame

Pending
26/01887/FULResidentialMajor

214 Kennedy Street Glasgow

Change of use consent for PBSA to short-stay accommodation during holidays, Glasgow. Permits seasonal use of a student building for transient guests outside term time at full application stage. No physical works are authorised, but the consent signals the building's operational flexibility and may…

Pending
26/01944/FULIndustrial£500k-1mest.

Unit 7 23 Nurseries Road Glasgow G69 6UL

375 sqm B8 storage warehouse, Glasgow. Section 42 application removing a condition from an approved 2022 consent, unlocking construction delivery. Structural frame, cladding and yard drainage packages move forward without design rework.

GroundworksStructural frameSteel

Pending
26/01951/FULResidential£100k-500kest.

10 Glenfinnan Drive Glasgow

Balcony infill and window alterations on a Glasgow flat block. Closes balconies with new windows and doors, reconfigures window apertures, and carries related works to the existing multi-storey residential building at full application stage. Glazing, joinery and masonry packages dominate, with…

GlazingJoineryBrickwork

Pending
26/01758/FULResidential£100k-500kest.

69 Leslie Street/54 Keir Street Glasgow

Re-roofing of flatted dwellings, Glasgow Leslie Street. Replaces the roof on an existing tenement block at full application stage. Roofing, scaffolding and drainage renewal packages suit specialist contractors working on listed or traditional Scottish stock.

Roof repairScaffoldingDrainage

Pending
26/01850/FULResidential£100k-500kest.

108 - 112 Queens Drive Glasgow

Re-roofing of a multi-unit flatted building, Glasgow. Replaces the roof covering across 108–112 Queens Drive at full application stage. Roofing contractors and material suppliers lead; scale and multi-unit scope drive procurement volumes.

Roof repair

Pending
26/01940/FULInstitutional£100k-500kest.

Queens Park Baptist Church 20 Balvicar Drive Glasgow G42 8QS

Lift installation and external stair replacement, Glasgow church. Adds accessible lift access and replaces external porch and stairs at full application stage. Steel stair fabrication, lift installation and structural modifications are the principal packages.

SteelM&EStructural repair

Pending
26/01276/FULCommercial£100k-500kest.

Storey 1 27 Hope Street Glasgow G2 6AB

Hairdresser premises converting to hotel extension, Glasgow city centre. First-floor unit changing use to ancillary hotel space at full application stage. Fit-out, M&E reconfiguration and partitioning open work packages for hospitality specialists and mechanical contractors.

Fit-outM&E

Pending
26/01980/LBAResidential£50k-100kest.

9 Ruskin Terrace Glasgow G12 8DY

Listed building consent for internal and external works to a Glasgow dwellinghouse. Adds extract vents and soil vent pipe to the rear, with alterations to the main house and annexe at consent stage. M&E installation, drainage and façade work on a protected structure require listed-building-aware…

M&EDrainageFaçade repair

Pending
26/01959/FULCommercial£50k-100kest.

556 Baltic Street Glasgow G40 4SF

Workshop converting to a retail unit, Glasgow Baltic Street. 170 sqm ground-floor change of use with new shopfront at full application stage. Shopfront glazing, fit-out and M&E packages suit local installers moving toward site.

Fit-outM&EGlazing

Pending
26/01956/FULResidential£50k-100kest.

18 Great George Street Glasgow G12 8LN

External refurbishment with re-roofing and stone repairs, Glasgow. Works to an existing building envelope including roof replacement and masonry remediation at full application stage. Roofing, facade and specialist stonework packages suit heritage and conservation contractors.

RoofingFaçade repairScaffolding

Pending
26/01882/FULResidential£50k-100kest.

Flat 1/1 3 Whitevale Street Glasgow G31 1QW

Dental practice converting to one flat, Glasgow. Changes a Class 1A commercial unit to a residential home at full application stage. Fit-out, rewiring, drainage and bathroom installation drive the work for specialist subcontractors in an urban conversion.

Fit-outM&EDrainage

Pending
26/01667/FULInstitutional£50k-100kest.

Pavillion 97 Haggs Road Glasgow G41 4RD

Education pavilion refurbishment with perimeter fencing, Glasgow. Upgrades an existing sports or teaching building plus adds boundary enclosure at full application stage. M&E, roofing repairs and site boundary works suit local contractors and fencing specialists.

M&ERoof repairHard landscaping

Pending
26/01878/PNTInfrastructure£50k-100kest.

Site To The South East Of 70 Cowcaddens Road Glasgow

Telecommunications monopole with equipment cabinets, Glasgow. Installs a new mast structure with associated network equipment at notification stage. Ground-mounting, civil works and electrical connections drive the delivery; local utilities and site services contractors are live.

GroundworksStructural frameM&E

Pending

Planning appeals in Glasgow City Council

Glasgow City Council is not in England, so the Planning Inspectorate does not decide its planning appeals. They are decided by Scottish Government Planning and Environmental Appeals Division (DPEA). SiteLens holds that body’s own record, read against that nation’s rate instead.

Appeals recorded
1,345
Judged either way
1,338
Allowed / dismissed
593 / 745
Overturn rate
Still collecting
That nation's rate
Not published

SiteLens is still collecting the DPEA's record, so a rate now would reflect which parts have been collected, not how Glasgow City Council fares.

Source: the DPEA's own published case record. Still being collected, so the counts are a floor.

Glasgow City Council approval rates by application type

Share of decided applications approved in the last 12 months.

  • householder93% (187 decided)
  • commercial86% (51 decided)
  • other88% (40 decided)
  • residential77% (31 decided)

What you get with SiteLens

Map and project brief

Every application mapped, with its category, trade, estimated value band and a plain-English brief.

Constraints and tenders

24 constraint flags on every site, and the public tenders and awards near it.

Daily alerts

New matching applications from this council, by email each morning.

Who's behind it (Pro)

The agent and applicant, their contact details where published, and the company directors.

Start tracking Glasgow today

The Free plan is free forever, no card needed. Pro is £39/mo, or £29/mo billed annually.

Start for free