Inverclyde planning applications
SiteLens tracks and classifies every planning application submitted to Inverclyde Council, updated daily. Inverclyde Council received 63 planning applications in the last 90 days, 2 of them major schemes. 96% of the applications it decided were approved, with a median decision time of 62 days.
Search Inverclyde planning applications
Filter by type, value, date and status. The council's own register is on the official Inverclyde Council planning portal.
Recent applications in Inverclyde
See all →Majors and higher-value work first, tree works, condition discharges and adverts last.
Site Of Former St Ninian's Parish Church Norfolk Road Greenock PA16 0JG
23-unit affordable housing scheme, Greenock, full application stage. New-build homes with parking, landscaping and open space on a 0.39-hectare former church site. Groundworks, drainage, frame and brickwork packages open first, with M&E and hard landscaping to follow.
GroundworksStructural frameBrickwork
The Glebe Sugarhouse Ker Street Greenock PA15 1LN
Community learning and events space conversion, Greenock. 1,830 sqm warehouse reconfigured for cultural use with new public square and ancillary buildings at full application stage. Fit-out, structural alteration, external works and hard landscaping drive the specification.
Fit-outM&EStructural repair
PLOT 4 Leperstone Avenue Kilmacolm
Single detached dwelling with garage, Kilmacolm, Inverclyde. Erects a one-and-a-half storey house and garage on Leperstone Avenue at full planning application stage. Groundworks, brickwork, roofing and drainage packages suit local subcontractors for this single plot.
GroundworksBrickworkRoofing
Kelburn Business Park Port Glasgow PA14 6TD
Warehouse extension at Kelburn Business Park, Port Glasgow, under a full planning application. Adds floorspace to an existing industrial building, with the proposed area not stated in the description. Groundworks, steel framing, cladding and roofing packages are open to local subcontractors.
GroundworksSteelBrickwork
Multi Use Games Area (MUGA) Next To Craigend Resource Centre Off Quarriers Street Greenock PA15 2HD
Multi-use sports area replacement at Greenock resource centre. Replaces an existing MUGA with new court surface, fencing, goals and hoops at full application stage. Hard landscaping, fencing and sports equipment installation drive the procurement, with drainage and line-marking to follow.
Hard landscapingDrainage
Office 67 West Blackhall Street Greenock PA15 1XE
Office-to-flats conversion creating three residential units, Greenock. Converts an existing office building to three self-contained flats at full application stage. Partitioning, rewiring, plumbing and fit-out drive the works, with new kitchens and bathrooms throughout.
Fit-outM&EDrainage
Grass Verge On Land At Earnhill Road Industrial Estate Larkfield Business Park PA16 0EQ
Lattice tower with three antennae and transmission dishes, Larkfield. Permitted-development telecoms installation with equipment cabin, meter cabinet and 2.4m palisade enclosure at prior approval stage. Structural steelwork, foundations, fencing and electrical distribution drive the trades.
GroundworksStructural frameSteel
1 Turnberry Avenue Gourock PA19 1JA
Single detached house with parking and landscaping, full planning consent sought. New 2-storey dwelling on greenfield or infill site in Gourock, at full application stage. Groundworks, frame, roof and fit-out trades can compete for subcontract packages.
GroundworksStructural frameBrickwork
Land West Of The Haven Horsecraigs Kilmacolm PA13 4TH
Mobile coffee van with hardstanding and parking, Kilmacolm. Siting a mobile catering unit with associated access, parking, refuse store and seating area at full application stage. Hard landscaping, drainage and a permanent concrete base are the primary packages for local contractors.
Hard landscapingDrainageGroundworks
Port Glasgow Library 12 Fore Street Port Glasgow PA14 5EQ
Two air source heat pumps for Port Glasgow Library, with external compound and pipework. Retrofits renewable heating to an existing institutional building at full application stage. M&E installation and heat distribution pipework dominate the scope for mechanical services contractors.
RenewablesM&E
12 Glamis Place Greenock PA16 7NB
Conversion of two flats into one dwelling, with roof repair and patio doors. Ground and first-floor flat consolidation and external alterations including partial roof replacement. Structural alteration, glazing and roof work for a below-average-value market.
Structural repairRoof repairGlazing
Hairy Beastie Ltd 54 & 56 Kempock Street Gourock PA19 1ND
Shopfront replacement and lighting scheme, Gourock, full application stage. Replaces and alters a Kempock Street retail frontage with new LED lighting and a retractable awning at 54 and 56. Glazing, joinery and lighting circuits are the packages for local shopfront installers, with awning fixings…
GlazingJoineryM&E
Shop 2B Jamaica Street Greenock PA15 1XU
Shopfront refurbishment at Jamaica Street, Greenock. Replaces fascia, pilasters, cornicing and window on a retail unit elevation at full application stage. Glazing, cladding and specialist joinery packages suit local shopfront installers.
CladdingGlazingJoinery
10B Hollybush Lane Port Glasgow PA14 6QZ
Flat converting to mixed-use dwelling and short-term let, Port Glasgow. One 74 sqm unit reconfigured to split occupation at full application stage. Partitioning, enhanced fire safety, separate metering and fit-out of the let portion drive the work.
Fit-outM&EDrainage
27 Castlehill Crescent Kilmacolm PA13 4HY
First-floor rear extension to a house in Kilmacolm, Inverclyde, at full application stage. Adds upper-floor living space to an existing dwelling at the rear. Brickwork, roofing, steel over the new opening and joinery packages suit local subcontractors.
BrickworkRoofingSteel
Planning appeals in Inverclyde Council
Inverclyde Council is not in England, so the Planning Inspectorate does not decide its planning appeals. They are decided by Scottish Government Planning and Environmental Appeals Division (DPEA). SiteLens holds that body’s own record, read against that nation’s rate instead.
SiteLens is still collecting the DPEA's record, so a rate now would reflect which parts have been collected, not how Inverclyde Council fares.
Source: the DPEA's own published case record. Still being collected, so the counts are a floor.
Inverclyde Council approval rates by application type
Share of decided applications approved in the last 12 months.
- householder100% (44 decided)
- commercial94% (18 decided)
- other92% (13 decided)
- residential100% (10 decided)
Nearby councils
Comparing planning tools?
What you get with SiteLens
Map and project brief
Applications on a live map, with categories, trades and plain-English briefs. Filter by estimated value band.
Constraints and tenders
24 constraint flags on every site, and the public tenders and awards near it.
Daily alerts
New matching applications from this council, by email each morning.
Who's behind it (Pro)
The agent and applicant, their contact details where published, and the company directors.
Start tracking Inverclyde today
The Free plan is free forever, no card needed. Pro is £39/mo, or £29/mo billed annually.
Start for free